Which of the following is the total float for the critical path? 01/29/2021 – by Mod_GuideK 0 Based on the table below: Which of the following is the total float for the critical path? A. 0 B. 1 C. 2 D. 3 SHOW ANSWERSCorrect Answer: A Explanation/Reference: