You have determined that a design error will interface with meeting technical performance objectives. Which of the following is the preferred response in this situation?
A. Simplify the overall technical complexity of the project
B. Develop alternative solutions to address the problem
C. Ignore the error and set new performance objectives
D. Reduce performance objectives to be equal to the current assessed value